Courtesy Navigation
Site Index Contact Port of Portland Port of Portland Home page Airports Home Marine Home Inside the Port Home
 
 
 
About the Port
Job Opportunities
Newsroom
Photo Gallery
Community Outreach
Community Events
Directions and Map
Leadership
Commission Information
Environmental Programs
Strategic Plan and Budget
Audit Reports
Ordinances, Policies and Rules
Construction Master Specifications and Design Guidelines
Business Opportunities
Active Bids and Proposals
Future Construction Contracts
Small Business Development Program
Projects, Plans and Studies
West Hayden Island
Willamette River Dredged Material Management Plan
Trade and Transportation Studies
Properties
Noise Management
spacer
Mitigation Sites
Mitigation Sites
Mitigation Sites
spacer Download flash PIC E-Zone Enhancement Planting

Background
This project stems from a Type II Environmental Review by the City of Portland in 1999 for removal of the E-zone designation from 2.04 acres of drainageways located within the Columbia South Shore Plan District. These drainages were filled as a result of activities associated with the Cascade Station development. The mitigation sites are located adjacent to a completed Army Corps of Engineers wetland mitigation site and adjacent to the 40-mile Loop Trail by the cul-de-sac of N.E. Alderwood Road at Portland International Center.

PIC E-Zone Enhancement Planting

This Environmental Review was linked to a second Type II Environmental Review in 1999 for impacts to the Environmental Zone from the construction of a bridge over the Columbia Slough. Mitigation consisted of re-vegetation of the environmental zone transition area along the Columbia Slough where the slough crossed the project site.

Mitigation Plan
The areas chosen for mitigation for impacts to the E-zone designation consisted of emergent and scrub-shrub wetland adjacent to small, artificial channels. Riparian and upland scrub shrub vegetation was already established in low densities, but there was extensive invasion of weedy species. The mitigation measures increased the density of plantings and implemented a weed management program to control invasive species.

Mitigation for impacts from the construction of a bridge over the Columbia Slough called for enhancement of the 50' transition zone on the north shore of the slough. This enhancement project was included as part of the Intergovernmental Agreement (IGA) with the Bureau of Environmental Services for Columbia Slough re-vegetation.

Status
Planting of the E-zone site was completed in April 2000, and a total of 5,927 plants were installed. The Port met its 5 year permit obligation to monitor the E-zone site by the end of 2005. The final monitoring which occurred during the summer of 2005 resulted in at least 80% plant survival with 100% aerial cover in some areas. The Port continues to manage and maintain the site by controlling invasive species and encouraging native plant establishment.

Planting of the transition zone was incorporated into the Intergovernmental Agreement with the City of Portland’s Bureau of Environmental Services in March 2000. In July 2001 a total of 2945 plants were installed, including big leaf maple, red alder, Oregon ash, black cottonwood, vine maple and thimbleberry. Monitoring and maintenance of the site is the responsibility of BES for five years as specified in the IGA. The Port inspects all sites following receipt of the annual monitoring report by BES. BES will have met their monitoring and maintenance obligation by the end of 2008.
spacer
Buffalo Street Site
Columbia Slough Re-vegetation
Elrod Road Site
Jewett Lake
Northwest Swale, Vanport Wetlands
PIC Corps of Engineers Mitigation Site
PIC E-Zone Enhancement Planting
Riverbank Sites
Rivergate Enhancement Site
Ramsey Lakes Mitigation Site
Randall Site
T-5 Powerline Site
Vanport Wetlands
West Hayden Island
West Wye Mitigation Site